|
R
N
O
|
Product Code & Name
|
Finish &
Colour
|
Product Composition
|
Mixing Ratio
(Base : Hardner)
By Volume
|
Recom.DFT & Drying Time
|
T.C.C
|
Pot Life @ 30° c
|
Over Coating Interval
|
Recomd Use
|
Method Of Application & Recommnded Thinner
|
|
1.
|
Ram Prime 101
Epoxy Clear Primer
|
Glossy
|
Two Pack Polyamide Cured Primer
|
3:1
|
30-35 mSD-30Min
TF-2.5 to 3 Hrs
HD- O/N
|
14-16 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For Concrete surface
as penetrating primer
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
2.
|
Ram Prime 102 Epoxy Zinc Chrome Primer
|
Matt Red
|
Two Pack Polyamide Cured Epoxy Primer With anticorrosive pigment like red oxide & zinc chrome
|
3:1
|
30-35 m
SD-25-30Min
TF-2.5 to 3 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For OEMS
Chemical,
Fertilizer,
Refineries and other industries
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
3.
|
Ram Prime 103 Epoxy Red Oxide Zinc Phosphate Primer
|
Matt Red
|
Two Pack Polyamide Cured Epoxy Primer With anticorrosive pigment like red oxide & zinc Phosphate
|
3:1
|
30-35 m
SD-25-30Min
TF-2.5 to 3 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For OEMS
Chemical,
Petrochemicals
complex
Fertilizer
and other industries
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
4.
|
Ram Prime 104 Epoxy Zinc chrome Yellow Primer
|
Matt
Yellow
|
Two Pack Polyamide Cured Epoxy Primer With anticorrosive
|
3:1
|
30-35 m
SD-25-30Min
TF-2.5 to 3 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For OEMS
Chemical,
Petrochemicals
complexes for excellent
corrosion resistance
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
5.
|
Ram Prime 105 Epoxy Zinc Phosphate Primer
|
Matt Grey
|
Two Pack Polyamide Cured Epoxy With zinc phosphate as anticorrosive pigment
|
3:1
|
30-35 m
SD-25-30Min
TF-2.5 to 3 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For OEMS
Chemical,
Petrochemicals
complexes for
excellent
corrosion
resistance
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
6.
|
Ram Prime 106 Epoxy Zinc Rich Primer
|
Matt Grey
|
Two Pack Polyamide Cured Epoxy loaded With zinc dust
|
3:1
|
50-60 m
SD-20-30Min
TF-2 Hrs
HD- O/N
|
8-10 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
Marine Environmental,
Structural
steel, refineries
as high
perfoemance coating
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
7.
|
Ram Guard 112
Epoxy Top Coat
|
Glossy,S/G,
Matt
Assorted Shade
|
Two Pack Polyamide Cured Epoxy Base Top Coat
|
3:1
|
30-35 m
SD-30Min
TF-2-3Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
Chemicals,
Fertilizer,
refineries,
also suitable
for MS,
concrete
surfaces
|
By Brush / Spray
Ramcoat Epoxy Thinner
|
|
8.
|
Ram Prime 201 Quick Drying Primer
|
Matt
Red/Grey
|
Single Pack spl Polymer base suitably pigmented with anticorrosive pigment
|
-
|
30-35 m
SD-8-10Min
TF-20-25min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
|
Min 8 Hrs
|
Recommended
for MS
substrate,
Domestic application
|
Special Thinner
|
|
9.
|
Ram Prime 231 Quick Drying Top Coat
|
Glossy,S/G,
Matt
Assorted Shade
|
Single Pack spl Polymer base suitably pigmented with anticorrosive pigment
|
-
|
30-35 m
SD-8-10Min
TF-20-25min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
|
Min 8 Hrs
|
Recommended
for MS
substrate,
interior & Domestic
application
|
By Brush / Spray
Spl Thinner
|
|
10.
|
Ram Prime 302 Polyurethane Red oxide zinc chrome primer
|
Matt Red
|
Two pack P U base Primer with anticorrosive pigment like red oxide & Zinc chrome
|
3:1
|
30-35 m
SD-15-20Min
TF-1 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
Recommended
for structures
steel
equipment,
chemical plant etc.
|
By Brush / Spray ramcoat P U Thinner
|
|
11.
|
Ram Prime 304 Polyurethane zinc chrome primer
|
Matt yellow
|
Two pack P U base Primer with Zinc chrome as action -pigment
|
3:1
|
30-35 m
SD-15-20Min
TF-1 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For structure,
equipment,
chemical,
plant,
refineries etc
|
By Brush / Spray ramcoat P U Thinner
|
|
12.
|
Ram Prime 305 Polyurethane zinc phosphate grey primer
|
Matt
Grey
|
Two pack P U base with Zinc phosphate as anti corrosive pigment
|
3:1
|
30-35 m
SD-15-20Min
TF-1 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For structure
equipment,
chemical plant,
refineries &
other industries
|
By Brush / Spray ramcoat P U Thinner
|
|
13.
|
Ram Thane 331 Polyurethane Top Coat
|
Glossy,S/G,
Matt
Assorted Shade
|
Two pack P U base aromatic Top Coat
|
3:1
|
30-35 m
SD-20-30Min
TF-1 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For interior
application
on MS
substrate
OEM’s etc.
|
By Brush / Spray ramcoat P U Thinner
|
|
14.
|
Ram Thane 332 Polyurethane Top Coat
|
Glossy,S/G,
Matt
Assorted Shade
|
Two pack P U base aromatic Chemical Resistant Top Coat
|
3:1
|
30-35 m
SD-20-30Min
TF-1 Hrs
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For interior
Chemical
plants,
OEM’s,
Maintainace
hygienic
coating etc.
|
By Brush / Spray ramcoat P U Thinner
|
|
15.
|
Ram Thane 341 Polyurethane Top Coat
|
Glossy,S/G,
Matt
Assorted Shade
|
Two pack P U base aliphatic Top Coat
|
3:1
|
30-35 m
SD-20-Min
TF-45Min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
For chemical,
Petrochemical plants.
MS ,SS,GI,
Plastic
FRP,Concrete
surface
OEM etc
excellent UV,
Water
resistant
Property
|
By Brush / Spray ramcoat P U Thinner
|
|
16.
|
Ram Thane 405 chlorinated zinc phosphate primer
|
Matt
Grey
|
Single pack chlorinated Rubber primer with zinc phosphate as anticorrosive pigment
|
-
|
30-35 m
SD-5Min
TF-15Min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
|
Min 8 Hrs
|
For storage tank
like acid.alkali (exterior)
Structural steel Work
|
By Brush / Sprey
Ramcoat C R Thinner
|
|
17.
|
Ram Chloro 412 Chlorinated Rubber Top Coat
|
S/G to Egg shell Assorted Shade
|
Single pack chlorinated Rubber base suitably pigmented Top Coat
|
-
|
30-35 m
SD-5Min
TF-15Min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
|
Min 8 Hrs
|
For storage tank like
acid.alkali (exterior)
Structural steel Work
|
By Brush / Sprey
Ramcoat C R Thinner
|
|
18.
|
Ram Chloro 435 Chlorinated Rubber
H B paint
|
S/G to Egg shell Assorted Shade
|
Single pack chlorinated Rubber base high build paint
|
-
|
50-60 m
SD-5Min
TF-15Min
HD- O/N
|
8-10 Sq Mtr / Ltr
|
|
Min 8 Hrs
|
Recommended
for fertilizer,
pharmaceutical,
paper plants.
for water resistance also.
|
By Brush / Spray
Ramcoat C R Thinner
|
|
19.
|
Ram prime 501
Etch Primer
|
Matt
Yellow
|
Two pack etch primer with Zn tetroxy chrome pigment
|
1: 1
|
8-10m
SD-5Min
TF-20Min
HD- O/N
|
6-8 Sq Mtr / Ltr
|
5-6 hours
|
Min.1 hr.
|
Suitable for
Galvenised or
Aluminium substrate
as a primer
to get
excellent adhesion
|
By Brush / Spray
Ramcoat Thinner
|
|
20
|
Ram prime 534 Epoxy HB Paint
|
S/g – Matt,
Assorted shades
|
Two pack polyamide cured epoxy base HB paint
|
3:1
|
50-60 m
SD-35Min
TF- 3 hrs.
HD- O/N
|
6-8 Sq Mtr / Ltr
|
5-6 hours
|
Min 8 Hrs
|
Suitable for
Aggressive envioronment
on structural
steel,chemical
petrochemical,
fertilizer plants
and other
industial
applications
|
By Brush / Spray
Ramcoat epoxy Thinner
|
|
21
|
Ram prime 535 Epoxy self priming HB Paint
|
S/g – Matt,
Assorted shades
|
Two pack polyamide cured epoxy base self priming HB paint
|
3:1
|
80-100 m
SD-35 Min
TF-3 hrs
HD- O/N
|
7-8 Sq Mtr / Ltr
|
5-6 hours
|
Min 8 Hrs
|
Suitable
for all round
performance
for chemical plants, oil tanks
exteriors,
marine atmoshphere,
very good resistance
to spillage and fumes
of acid, alkali,
salt water ..
|
By Brush / Spray
Ramcoat epoxy Thinner
|
|
22
|
Ram Guard 635 Epoxy HB MIO coating
|
Matt,
Reddish Brown
|
Two pack polyamide cured epoxy base intermediate coat
loaded with MIO pigment
|
3:1
|
50-60 m
SD-35 Min
TF-3 hrs
HD- O/N
|
8 -10 Sq Mtr / Ltr
|
5-6 hours
|
Min 8 Hrs
|
For
aggressive coastal
and industrial
area on steel
structure,
chemical,
fertilizers,
petrochemical plants etc..providing
superior water reistance.
|
By Brush / Spray
Ramcoat epoxy Thinner
|
|
23
|
Ram CT epoxy
(Coaltar)
|
Matt to eggshell
Black
|
Two pack epoxy base coaltar coating
|
4:1
|
50-60 m
TF-4 hrs
HD- 24 hrs.
|
8 -10 Sq Mtr / Ltr
|
5-6 hours
|
24 hours
|
Suitable for barrage gates,under
water
pipelines,
water tanks etc..to get excellent water
and chemical resistance
|
By Brush / Spray
Ramcoat epoxy Thinner
|
|
24
|
Ram Prime HR Aluminium
(200-250°C)
|
Smooth
silver
|
Single pack spl.Polymer base
Heat resistant Aluminium paint
for temp. resist. upto 250°C
|
-
|
20-25 m
SD – 7-10 min.
TF-15-20 min.
HD- O/N
|
8 -10 Sq Mtr / Ltr
|
--
|
3-4 hours
|
Suitable for
boiler,
chimney,
furnace,
etc..
for temperature
resistance
200-250°C required
|
By Brush / Spray
Ramcoat spl Thinner
|
|
25
|
Ram Prime HR Aluminium
(400-600°C)
|
Smooth
silver
|
Single pack silicone resin base
Heat resistant Aluminium paint
for temp. resist. upto 600°C
|
-
|
20-25 m
SD – 20 min.
TF-30-40 min.
HD- stvg.@240°/1 hr.
|
8 -10 Sq Mtr / Ltr
|
--
|
3-4 hours
|
Suitable for
boiler,
chimney,
furnace,
etc..for temperature resistance
upto 600°C required
|
By Brush / Spray
Ramcoat spl. Thinner
|
|
26
|
Ram coat Stoving Enamel
|
Glossy/ semiglossy/matt
Assorted
shades
|
Single pack stoving paint
|
-
|
30-35m
stvg.@120°/1 hr.
|
10-12 Sq Mtr / Ltr
|
--
|
--
|
Suitable for equipment /machineries
/OEMs and other industrial application.
|
By Brush / Spray
Ramcoat stoving Thinner
|
|
27
|
Ram coat Road marking paint
|
Semiglossy-matt
Assorted
shades
|
Single pack spl. Polymer base road marking paint
|
-
|
40-45m
SD – 10-15 min.
TF-20-25 min.
HD- O/N
|
8-10 Sq Mtr / Ltr
|
--
|
--
|
Suitable for
Concrete as well as bitumen covered road for marking purpose.
|
By Brush / Spray
Ramcoat Thinner
|
|
28
|
Ram Thane 341 Polyurethane Flexible coating
|
Glossy,S/G,
Matt
Assorted Shade
|
Two pack P U base aliphatic Top Coat having excellent flexibility and adhesion
|
3:1
|
30-35 m
SD-20 Min
TF-40 Min
HD- O/N
|
11-13 Sq Mtr / Ltr
|
5-6 Hrs
|
Min 8 Hrs
|
Suitable for
Substrate like leather,rubber, PU foam,Plastic,FRP etc..where flexibility is prime requirement
|
By Brush / Spray ramcoat P U Thinner
|